Construction continues to move forward on the new West Liberty High School Activities Building, with several exciting milestones taking place in recent weeks as the project moves closer to completion.

The railing around the indoor track has been installed, brining another major feature of the facility into place. Painters are also making their way throughout the building, applying the first coat of paint as interior work continues to take shape. Window installation has begun, and stairways on both the north and south sides of the building are now in place.

Plumbing, electrical, and HVAC contractors continue working throughout the facility, while concrete work outside the building remains ongoing.

As construction continues, we want to remind all students, staff, and members of the public to use caution when entering and exiting the high school campus. Please watch for construction vehicles and equipment traveling in and out of the campus. Additionally, please stay out of all fenced-in construction areas. These areas remain active construction sites, and entering them is prohibited for everyone's safety.

We are excited to see this project nearing completion and look forward to opening the new Activities Building to our students early in 2027! This facility will be a tremendous addition to the West Liberty Community School District and provide exciting new opportunities for our students and the entire Comet community.

GO COMETS!

Drone Southeast

A view from high above the West Liberty Foods Athletic Complex looking back at the new Activities Building.

Batting Cages

Batting cage area on the 2nd floor looking back at the baseball and softball storage rooms. We have room for 3 full batting cages in this area.

Golf

The golf room. In front of the short walls will be a golf simulator and hitting bay. The area where the picture is being taken from will be a putting green with a chipping area.

Southeast 1st Floor

A view from the southeast corner of the 1st floor. This area will be covered with a turf field that will be 40 yards long and an entire football field wide. The ceiling in the middle is 42 feet high! There is an additional turf area under the 2nd floor track.

Weight Room

New weight room. To the left will be a nutritional area. This space will be filled with all new weight equipment and over looks the Athletic Complex. We are excited for every student to be able to utilize this space!

West 2nd Floor

From the 2nd floor track looking back to the east. You can see the main entrance to the building on the first floor. This building is HUGE and allows many different activities to use the space at the same time, all with their own space.

Northeast 2nd Floor

Looking from the northeast corner of the 2nd floor onto the open turf area below.

Southwest 1st Floor

Looking from the southwest corner of the 1st floor back to the east. The 2nd floor windows on the north and south side of the building will allow natural light into the facility.

Team Room

This is the team room. When complete this room will serve many purposes as a multi-use space. One of the main purposes of this room will be for teams to watch film and meet before, during, and after outdoor events. The door on the white wall on the left side will lead outside to a sidewalk to the complex. The door on the left side of the blue wall leads to a new trainers room.